Wholesale Lounges
Company
Shop By Category
T&Cs
Shop Online
  • Box contents listed
  • Free tracked delivery across the UK over £75
  • 14-day returns

two seater sofa | 2 seater loveseat couch | corduroy two seater sofa

Vesgantti Corduroy Two Seater Sofa

£519.99 £623.99 Save £104
  • Space For Two
  • Spring Cushion Support
  • Corduroy Texture
  • Tool Free Assembly

Price: £519.99 £623.99

  • Free tracked delivery across the UK on orders £75+, otherwise a flat £10
  • Pay by card or PayPal, handled by the payment provider
  • 14 days to change your mind, plus your statutory rights
Product specifications
BrandVesgantti
ModelLoveseat Sofa
Sofa TypeLoveseat
Seating Capacity2 people
Overall Dimensions171.5 cm W x 76 cm D x 88 cm H
Seat Depth54 cm
Listed Seat Height88 cm, requires confirmation as this matches the listed overall height
Item Weight34.3 kg
Maximum Weight Capacity350 kg
Upholstery FabricCorduroy
Listed ColourBlue + Walnut Wood
Upholstery ColourBlue
FirmnessMedium
Cushion SupportSpring cushion
Seat Cushion DetailsQuantity listed as 2; configuration also described as a single cushion seat, so confirmation is needed
AssemblyRequired, listed as tool free
Included ComponentsArmrest, back cushion, legs and spring cushion
ModularNo
StyleModern
Intended SettingIndoor
Recommended UseResidential and commercial
Country Of OriginChina
Weight34.3 kg
Shipping & returns

Tracked delivery anywhere in the UK. It is free on orders of £75 or more, and a flat £10 below that.

Under the Consumer Contracts Regulations 2013 you have 14 days from delivery to cancel for any reason, and a further 14 days to send it back in resaleable condition. We refund the price you paid, including standard delivery. You cover the cost of returning it unless the item is faulty.

If it arrives faulty, damaged or not as described, we put it right at no cost to you under the Consumer Rights Act 2015, return postage included.

Shipping details · Refunds and returns

Space For TwoTwo-person seating in a 171.5 cm wide loveseat.
Spring Cushion SupportSpring cushioning pairs with a listed medium firmness.
Corduroy TextureRidged blue upholstery adds a tactile finish.
Tool Free AssemblyListed tool-free setup for a sofa that requires assembly.

Make room for relaxed evenings with a corduroy two seater sofa.

A 54 cm seat depth, spring cushioning and supportive armrests give this two-person loveseat a comfortable place in everyday living.

Make space for two with a loveseat measuring 171.5 cm wide.

Settle into a 54 cm seat depth with spring cushioning and medium firmness.

Add texture to your room with blue corduroy upholstery and walnut wood detailing.

Rest your arms on shaped armrests while reading or watching television.

Plan a straightforward setup with the listed tool-free assembly design.

Vesgantti Corduroy Two Seater Sofa

This Vesgantti loveseat gives two people a place to sit without choosing a larger sofa. Its listed dimensions are 171.5 cm wide, 76 cm deep and 88 cm high. That makes it worth considering for a living room, apartment or second seating area, provided the measured space and access route suit it.

Vesgantti Corduroy Two Seater Sofa

Blue corduroy upholstery brings a visible ridged texture to the design. The listed Blue + Walnut Wood colour combination pairs that fabric with wood detailing for a modern look. The upholstery fibre composition is not specified, so check before ordering if a particular fabric blend matters to you.

Vesgantti Corduroy Two Seater Sofa

Spring cushioning and a medium firmness description help explain the intended seating feel. A 54 cm seat depth provides room to settle back, while the armrests offer a resting point for your arms. Personal comfort still depends on your height, posture and preferred way of sitting.

Vesgantti Corduroy Two Seater Sofa

Assembly is required and is listed as tool free. The included components are an armrest, back cushion, legs and spring cushion. At 34.3 kg, the sofa needs a planned route into the room and suitable help with moving and setup.

Vesgantti Corduroy Two Seater Sofa

The listed maximum weight capacity is 350 kg, and the sofa is intended for indoor use. Two details need confirmation before they guide a purchase, because the listed seat height matches the overall height and the cushion count conflicts with the configuration description. Ask for clarification if either affects your choice.

Not sure yet? That is fine.

A lounge has to suit the room and the people who sit on it, and you cannot always judge that from a photograph. If it is not right for you, send it back within 14 days of delivery in resaleable condition and we refund the price you paid, including standard delivery. That is on top of your Consumer Rights Act 2015 rights if anything arrives faulty.

If it turns up faulty, damaged or not as described, that is on us. The Consumer Rights Act 2015 covers you, and we pay the return postage. Read the full detail on our refunds and returns page, or ask us anything before you order.

Frequently Asked Questions

What is this product?

This is a Vesgantti two seater sofa in a loveseat format. It is a non-modular sofa intended for indoor use.

How many people can sit on it?

The listed seating capacity is two people. Check the overall width against your preferred sitting space, because usable seat width is not specified.

What are the overall dimensions?

The listed dimensions are 171.5 cm wide, 76 cm deep and 88 cm high. Allow additional space around it for walking and nearby furniture.

How deep is the seat?

The seat depth is listed as 54 cm. Compare that measurement with a chair you already find comfortable.

What is the seat height?

The record lists a seat height of 88 cm, but it also gives 88 cm as the overall height. Ask for a confirmed floor-to-seat measurement before relying on that figure.

What is the maximum weight capacity?

The listed maximum weight capacity is 350 kg. Treat this as the sofa's overall limit, not an allowance for each person.

How much does the sofa weigh?

The listed item weight is 34.3 kg. Packaging weight and carton dimensions are not specified.

What fabric does it use?

The upholstery fabric is listed as corduroy. The fibre blend is not specified, so do not assume it is cotton, polyester or another particular fibre.

What colour is this version?

The product details describe blue upholstery and a Blue + Walnut Wood colour combination. Screen settings and room lighting can change how a blue corduroy loveseat appears.

Is the wood walnut?

Walnut Wood appears in the listed colour description. The record does not establish that the timber species is walnut, so confirm that separately if it matters.

How firm is the seating?

The listed firmness is medium. A medium firmness sofa can feel different to different people, so use this as a guide rather than a comfort guarantee.

How does the cushioning work?

The sofa is described as using spring cushioning. Springs respond to seated pressure, but the record does not specify the spring construction or cushion filling.

Does it have armrests?

Yes, armrests are listed among the features and included components. They provide a resting place for your arms while sitting.

How many seat cushions are included?

The details list two seat cushions but also describe a single cushion seat configuration. Confirm the layout before ordering if separate cushions are important to you.

Does it need assembly?

Yes, assembly is required. Read the supplied instructions before starting and check that the listed components are present.

Are tools needed for assembly?

The product is listed as a tool free assembly sofa. The record does not give a setup time, so leave enough time to follow the instructions carefully.

Is it a modular sofa?

No, the product details identify it as non-modular. Do not plan on adding matching sections or changing its layout as a modular system.

Can it be used outdoors?

No outdoor use is listed. This indoor two seater couch should be kept in a suitable indoor setting.

Would it suit an apartment?

It may suit an apartment if its dimensions work with your room and access route. For an apartment loveseat, measure doorways and tight turns as well as the final floor space.

Is it suitable for a reading room?

A reading room loveseat can provide shared seating with armrests and a back cushion. Compare the 54 cm seat depth with your preferred reading posture before deciding.

Can it be used in commercial spaces?

Residential and commercial uses are listed. No commercial compliance details are specified, so confirm any requirements for your particular premises.

Is it suitable for pets or children?

The record does not state pet resistance, stain resistance or child-specific features. Consider your household's cleaning needs and follow normal furniture safety precautions.

Can the covers be removed and washed?

Removable or machine-washable covers are not confirmed. Follow the care label and do not remove covers for washing unless the instructions permit it.

How should I clean the corduroy?

Gently remove loose dust with a suitable upholstery attachment. Blot spills promptly, then follow the care label before applying any cleaner.

How should I move the sofa?

Plan the route and arrange suitable help for its listed 34.3 kg weight. Avoid dragging it, and follow any handling guidance supplied with the sofa.

Where is it made?

The listed country of origin is China. The brand and manufacturer are both listed as Vesgantti.

How long will delivery take?

A delivery lead time is not specified in this record. Check the destination-specific delivery details before ordering and confirm any access arrangements.

What are the return and warranty terms?

This record does not specify a return window or warranty. Read the storefront's current policies and ask about assembled furniture before purchasing.

Could I buy it as a gift?

Yes, but a sofa gift is best agreed with the recipient first. Confirm their preferred style, available space and delivery access before choosing this modern loveseat sofa.

What if it is not right for my room?

Contact the store to discuss the options under its current returns policy. Keep the packaging where practical and check the terms before assembling or using the sofa.

Choosing a Two Seater Sofa for Your Space

6 min read Wholesale Lounges

A room can need more seating without having room for a large sofa. Perhaps two people share a small lounge, or a quiet corner needs somewhere more inviting than a spare dining chair. The challenge is finding a sofa that fits the floor plan and still works for the way you sit.

The Vesgantti two seater sofa is a loveseat with blue corduroy upholstery, spring cushioning and armrests. Its listed width is 171.5 cm, with an overall depth of 76 cm and height of 88 cm. Those figures are a useful starting point. The next step is checking how they translate into your home.

Start with the room, not the photograph

Photos show the sofa's style, but they cannot tell you how much walking space will remain beside it. Mark out a rectangle measuring 171.5 cm by 76 cm on the floor with removable tape. Then move around it as you would on a normal day.

Check whether a nearby door can open fully. Think about access to drawers, shelves and sockets. If there is a coffee table, leave enough room to get in and out of the seat without turning sideways.

A compact living room sofa should make a room easier to use, not just fill an empty wall. Keep the outline in place for a while and see whether it interferes with your usual route. This simple test can reveal problems that a quick measurement misses.

Check the route into your home

The final position is only part of the fit check. A sofa also has to pass through the entrance and reach the room.

Measure door openings, hallways and any tight corners. Stairs and shared building entrances deserve special attention. If a lift is involved, check its opening and internal space rather than assuming it can carry the furniture.

The listed item weight is 34.3 kg. Carton dimensions and packaged weight are not supplied, so the assembled measurements do not confirm delivery access on their own. Ask for packaging details if the route is close. Also check what the delivery service includes before planning who will move it indoors.

Understand the seating measurements

Overall depth and seat depth describe different things. The 76 cm overall depth covers the whole sofa from front to back. The 54 cm seat depth describes the seating area.

To judge that number, measure a chair or sofa you already like. Sit in your usual position and notice where your knees fall. Some people enjoy sitting well back, while others prefer a shallower seat that lets their feet rest naturally on the floor.

The seat height needs clarification. The product record gives 88 cm for both seat height and overall height. Do not use that as a confirmed floor-to-seat measurement. If ease of standing or foot placement is important, ask for a checked seat height before buying.

What spring cushioning and medium firmness tell you

This spring cushion sofa is described as medium in firmness. Those details help narrow your choice, but they do not predict exactly how it will feel to you.

Springs respond to pressure as you sit. The record does not describe the spring layout, filling layers or how the seat changes with use. It would be unwise to assume a particular level of bounce or a fixed lifespan from the word “spring” alone.

Medium firmness is also a broad description. Your weight, posture and previous sofa will affect your impression. If you usually prefer a very soft seat or a particularly firm one, consider whether a medium firmness sofa matches that preference. Armrests and a back cushion add resting points, but personal comfort still needs thought.

Decide whether two seats are enough

A two person couch makes sense when most use involves one or two people. It can serve as the main sofa in a smaller room or as extra seating alongside other furniture.

Think about your busiest regular evening, not just the quietest one. If several people often gather in the room, consider where everyone else will sit. A loveseat may work well with existing chairs, provided the arrangement leaves clear walking routes.

The listed maximum weight capacity is 350 kg for the sofa. It is not a separate allowance for each seat. Usable internal seat width is not specified, so the overall width alone cannot tell you how much space each person will have between the arms.

Choose corduroy for its texture

Corduroy has a ridged surface that gives upholstery a distinct look and feel. On this blue upholstered sofa, that texture is part of the design rather than a flat, smooth finish.

Think about how it will sit beside the materials already in your room. Plain cushions or a simple rug can let the ridges remain visible without adding more pattern. You do not need to replace everything around a new sofa to make it feel at home.

The fabric is identified as corduroy, but its fibre composition is not supplied. Do not assume a particular blend or cleaning method. If you need a specific material because of a household preference, ask for the upholstery composition before ordering.

Read the colour description carefully

The product details list blue upholstery and a Blue + Walnut Wood colour combination. This gives you a broad guide to the palette, but it is not proof of the timber species.

If actual walnut construction matters to your choice, request confirmation. A colour or finish name should not be treated as a full material specification.

Blue can also look different under warm lamps, daylight and screen settings. Compare the available images, then consider the light in the room where the sofa will sit. If you are matching an existing blue item closely, ask whether further colour information is available rather than relying on one image.

Check the details that remain unclear

Two cushion descriptions appear in the product record. One lists a seat cushion quantity of two, while another calls the configuration a single cushion seat. That difference needs confirmation.

It matters if you prefer separate seating areas or have a strong preference about the appearance of the seat. Do not assume the cushions are reversible or that their covers can be removed. Neither feature is confirmed.

The sofa is listed as non-modular. Choose it as a complete loveseat, not as the start of a sectional layout. If future rearrangement is a priority, compare that fixed format with the way you expect the room to change.

Plan for assembly without guessing the time

Assembly is required, and the product is described as tool free. That can simplify preparation, but it does not mean setup is instant or that one person should handle every stage.

Clear a work area before unpacking. Read the supplied instructions first, then identify the components and check them against the included list. The record names an armrest, back cushion, legs and spring cushion.

Keep the packaging until you have checked the parts and understood the return conditions. Arrange suitable help for moving the sofa, and follow the supplied handling guidance. No assembly duration is given, so avoid building your delivery-day schedule around an assumed completion time.

Match the sofa to its intended setting

This is an indoor sofa. Residential and commercial uses are listed, but that does not confirm suitability for every workplace or public setting.

For home use, think about daily habits. A sofa with armrests may appeal for reading, conversation or watching television. A small lounge sofa can also create a separate sitting area where a larger piece would restrict movement.

For commercial use, check the requirements that apply to the premises. The record does not provide commercial compliance details. Likewise, it does not establish stain resistance, pet resistance or child-specific features. If one of those is essential, seek clear confirmation rather than inferring it from the fabric or style.

Keep care simple and cautious

Start with the care label supplied with the sofa. Corduroy upholstery is not enough information to choose a cleaning chemical or washing method.

For routine care, remove loose dust gently with a suitable upholstery brush or vacuum attachment. If something spills, blot it with a clean cloth instead of rubbing it across the ridges. Check any cleaner on a hidden area first, following the care instructions.

Do not machine wash covers unless the label allows it. Avoid prolonged direct sunlight and strong heat sources where possible. When repositioning the sofa, arrange help rather than dragging it across the floor. These are sensible habits, not a promise that the upholstery will resist every mark.

Confirm delivery and policies before paying

A good furniture choice includes the practical terms around the purchase. Delivery lead time, packaged dimensions, warranty and return window are not specified in this record.

Check the current storefront information for your destination. Ask about access restrictions, delivery arrangements and whether assembly changes return eligibility. If the sofa is a gift, involve the recipient in these checks.

It is also worth resolving the seat height and cushion layout at this stage. Clear answers before ordering are more useful than discovering a mismatch after setup.

The short version

This Vesgantti loveseat offers seating for two, blue corduroy upholstery, spring cushioning and a listed medium firmness. Its 171.5 cm width and 54 cm seat depth give you concrete measurements to compare with your room and current furniture.

Measure the floor space and delivery route, confirm the unclear details, and read the care and return terms. If those checks match your needs, this corduroy two seater sofa is worth considering for your indoor seating space.

Browse the shop

Will this loveseat fit your room?

Compare the listed dimensions with your space and confirm any unclear measurements before ordering.

Ask us a question

Page summary

The Vesgantti Corduroy Two Seater Sofa is an indoor, non-modular loveseat with seating for two. Listed overall dimensions are 171.5 cm wide, 76 cm deep and 88 cm high. It weighs 34.3 kg and has a listed maximum weight capacity of 350 kg. Product details describe blue corduroy upholstery, a Blue + Walnut Wood colour combination, medium firmness, spring cushioning, armrests and a 54 cm seat depth. Assembly is required and described as tool free. Country of origin is China. Upholstery fibre composition, delivery lead time and warranty are not specified in this record. The listed seat height and conflicting seat cushion descriptions require confirmation before purchase.